April Progress Update May 10, 2024 Rausch Infrastructure With the concrete for the barrel reconstruction fully cured, April’s progress was the installation of the CFRP liner system. Final coat of liner completed in barrel. Surface prep and primer. Barrel access. Final coat of liner at RCP elbow and guard beam.